The 495 NEXT team has produced visualizations of what the proposed design might look like from viewpoints in the Snow-Lear and McLean Hamlet neighborhoods. These visualizations show ramps that would be built in later phases of the project, likely in 2030 or beyond.
Downloads |
Locator Map for Dulles Toll Road Interchange Visualizations (January 2021) (PDF, 2.5MB) |
Visualizations from Snow-Lear and McLean Hamlet (January 2021) (PDF, 19MB) |
The 495 NEXT team has produced visualizations of what the proposed design might look like from viewpoints from streets near the George Washington Memorial Parkway Interchange.
Downloads |
Locator Map for George Washington Memorial Parkway Area Visualizations (January 2021) (PDF, 2MB) |
Visualizations from Live Oak Drive (January 2021) (PDF, 2.3MB) |
Visualizations from Butternut Court (January 2021) (PDF, 6MB) |
Visualizations from Lawton Street (January 2021) (PDF, 6MB) |
As part of meetings with the National Park Service about potential project impacts on the George Washington Memorial Parkway, the 495 NEXT team produced a booklet with visualizations and other information related to proposed design options on and around the parkway.
Downloads |
Visualizations Booklet for National Park Service and George Washington Memorial Parkway (February 2020) (PDF, 2.5MB) |